General Baseline HVAC System Requirements (G3.1.2). Building Performance Calculations (G3.1). Calculation of the Proposed Design and Baseline Building Performance (G3). Renewable, Recovered, and Purchased Energy (G2.4). Proposed Building and Baseline Building Performance (G2.2.2). Calculation of Design Energy Cost and Energy Cost Budget (11.5). Exceptional Calculation Methods (11.4.5). Renewable, Recovered, and Purchased Energy (11.4.3).Simulation General Requirements (11.4).Service Water Pressure-Booster Systems (10.4.2).Additional Interior Lighting Power Using Nonmandatory Controls (9.6.3).Additional Interior Lighting Power (9.6.2).Alternative Compliance Path: Space-by-Space Method (9.6).Building Area Method Compliance Path (9.5).Interior and Exterior Luminaire Wattage (9.1.4).Low-Voltage Dry-Type Distribution Transformers (8.4.4).Buildings with High-Capacity Service Water Heating Systems (7.5.3).Service Water Heating Equipment (7.5.2).Space Heating and Service Water Heating (7.5.1).Service Water Heating System Controls (7.4.4).( Service Hot-Water Piping Insulation (7.4.3).Table 6.8.1-14-Vapor Compression Based Indoor Pool Dehumidifiers-Minimum Efficiency Requirements.Table 6.8.1-13-Commercial Refrigeration-Minimum Efficiency Requirements.Table 6.8.1-12-Commercial Refrigerators and Freezers-Minimum Efficiency Requirements.
Table 6.8.1-11-Air Conditioners and Condensing Units Serving Computer Rooms-Minimum Efficiency Requirements. Table 6.8.1-10-Electrically Operated Variable-Refrigerant-Flow Air-to-Air and Applied Heat Pumps-Minimum Efficiency Requirements. Table 6.8.1-9-Electrically Operated Variable-Refrigerant-Flow Air Conditioners-Minimum Efficiency Requirements. Table 6.8.1-8-Heat Transfer Equipment-Minimum Efficiency Requirements. Table 6.8.1-7-Performance Requirements for Heat-Rejection Equipment-Minimum Efficiency Requirements. Table 6.8.1-6-Gas- and Oil-Fired Boilers-Minimum Efficiency Requirements. Table 6.8.1-5-Warm-Air Furnaces and Combination Warm-Air Furnaces/Air-Conditioning Units, Warm-Air Duct Furnaces, and Unit Heaters-Minimum Efficiency Requirements. Table 6.8.1-4-Electrically Operated Packaged Terminal Air Conditioners, Packaged Terminal Heat Pumps, Single-Package Vertical Air Conditioners, Single-Package Vertical Heat Pumps, Room Air Conditioners, and Room Air-Conditioner Heat Pumps- Minimum Eff. Table 6.8.1-3- Water-Chilling Packages-Minimum Efficiency Requirements. Table 6.8.1-2-Electrically Operated Unitary and Applied Heat Pumps- Minimum Efficiency Requirements. Table 6.8.1-1-Electrically Operated Unitary Air Conditioners and Condensing Units- Minimum Efficiency Requirements. ( Minimum Equipment Efficiency Tables (6.8). Hydronic System Design and Control (6.5.4). Simultaneous Heating and Cooling Limitation (6.5.2). Walk-In Coolers and Walk-In Freezers (6.4.5). HVAC&R System Construction and Insulation (6.4.4). Equipment Efficiencies, Verification, and Labeling Requirements (6.4.1). Simplified Approach Option for HVAC Systems (6.3). Product Information and Installation Requirements (5.8). Building Envelope Trade-Off Option (5.6). Using the Criteria Tables (5.5.1 and 5.5.2). Prescriptive Building Envelope Option (5.5). Ashrae 90.1 2016 pressure booster verification#
Verification and Commissioning Reporting (4.2.5). Labeling of Materials and Equipment (4.2.3). Alternative Materials, Methods of Construction, or Design (4.1.3). 03 Definitions, Abbreviations, and Acronyms.